Hueco Mountain Wind Ranch® at El Paso
El Paso County, TX
- The first renewable facility certified as a Renewable Energy Credit Generator by the Public Utility Commission of Texas
- The project produces approximately 4,000 Renewable Energy Credits (RECs) each year
SERVICES PROVIDED: Development and Construction Consulting / Professional Services
SIZE: 1.32 MW
LOCATION: El Paso County, TX
COMMERCIAL OPERATION DATE: March 2001
TURBINE EQUIPMENT: 2 Vestas V47 660kV wind turbines
UTILITY: El Paso Electric Coop
TRANSMISSION: 138 kV Transmission Line
INTERCONNECTION: 1-15 MVA Substation
LAND: 1 landowner
CONTRACTOR: Virtus Construction
EPC CONTRACTOR, BOP MANAGEMENT, O&M PROVIDER: Cielo Wind
MAJORITY OWNER: El Paso Electric