Hueco Mountain Wind Ranch® at El Paso

El Paso County, TX

  • The first renewable facility certified as a Renewable Energy Credit Generator by the Public Utility Commission of Texas
  • The project produces approximately 4,000 Renewable Energy Credits (RECs) each year

SERVICES PROVIDED: Development and Construction Consulting / Professional Services

SIZE: 1.32 MW

LOCATION: El Paso County, TX

COMMERCIAL OPERATION DATE: March 2001

TURBINE EQUIPMENT: 2 Vestas V47 660kV wind turbines

UTILITY: El Paso Electric Coop

TRANSMISSION: 138 kV Transmission Line

INTERCONNECTION: 1-15 MVA Substation

LAND: 1 landowner

CONTRACTOR: Virtus Construction

EPC CONTRACTOR, BOP MANAGEMENT, O&M PROVIDER: Cielo Wind

MAJORITY OWNER: El Paso Electric