Spinning Spur Wind Ranch®
Oldham County, TX
- Energy for approximately 56,000 households per year
- Energy delivered to SPP through shared transmission facilities
SERVICES PROVIDED: Development and Construction Consulting / Professional Services
SIZE: 161 MW
LOCATION: Oldham County, TX
OPERATING SINCE: 2012
UTILITY: Southwetern Public Service Company (d/b/a Xcel Energy, Inc.)
TURBINE EQUIPMENT: 70 – Siemens SWT101/108 2.3 MW wind turbines
TRANSMISSION:1- 345 kV Substation, Joint Use Switching Station, 33-mile Transmission Line
INTERCONNECT: Potter County Interchange
LAND: 35 landowners
EPC CONTRACTOR: Wanzek Construction, Inc.
DEVELOPER: Cielo Wind Power
OWNER: EDF-RE US Development LLC