Spinning Spur Wind Ranch®

SIZE: 161 MW

LOCATION:  Oldham County, Texas

OPERATING SINCE:   2012

UTILITY: Xcel Energy

TURBINE EQUIPMENT:  70 – Siemens 2.3 MW

TRANSMISSION:345 kV Substation, Joint Use Switching Station

INTERCONNECT:Potter County Interchange

LAND: 35 landowners; 28,425 acres

CONTRACTOR: Wanzek Construction, Inc.

DEVELOPER: Cielo Wind Power

OWNER:  EDF-RE US Development LLC

HIGHLIGHTS:

 

  • Energy for approximately 56,000 households per year
  • Energy delivered to SPP through shared transmission facilities